Bespoke Joinery


Case Study – Church Bell Tower Renovation


As part of the renovation of the United Reformed Village Church in Castle Camps, OCS were tendered to undertake a complete renovation of the extremely rotten structure of the bell tower on the roof of the building.

As part of these works the rotten structure was dismantled and taken down along with the 150 year old bell. We then manufactured a new like for like structure for the bell using traditional methods in our workshop. The sections were then taken up to the roof and installed on the plinth base.